Need a Reliable Partner for your Fueling Station and C-Store?

Contact Us Now!
Posts Currently viewing the category: "Construction"

This project was a turnkey project completed in a minimal 60 day period. This project included 24 fueling positions with Gilbarco MPDs we performed site dewatering, tank sets (three 30,000 and one 20,000 gallon tanks), product piping, doghouse set, full concrete work within our project zone, fuel island and dispenser install and startup…(Read More)

This project was a challenging tank install two 20,0000 gallon tanks as the ground water was very near the surface providing what could be a risky install as the tanks could float if not properly balanced. CSI utilized slide rail shoring provided by DP Nicoli to dig our 43’ x 36’ by 17’ deep…(Read More)

Work included: Fuel tank excavation, Placement and anchoring of new tanks, Backfill of tanks, All fuel lines and piping connections installed per DEQ regulations, Construction of canopy, Fuel island construction including operational testing. Client: Edge Development  Year Built: 2014…(Read More)

Work included: Fuel tank excavation, Placement and anchoring of new tank, Backfill of tank, All fuel lines and piping connections installed per DEQ regulations, Construction of canopy, Fuel island construction including operational testing. Client: Shell Year Built: 2014…(Read More)